Maintenance Planning

Maintenance Planning

Maintenance shops around the world operate day in and day out, fighting the never ending battle with Operations for equipment control. When the equipment is available, how much of that time is used for maintenance? How much is wasted on a lack of pre-planning?

While this war seems unending, sound practices can be implemented to leverage the precious time Maintenance departments have equipment available for maintenance. Planning and scheduling are routine terms used to describe the process in which the tasks and jobs are performed through an organized and thought out process.

Planning for maintenance is much more than just allotting a technician’s time to perform the work. Good planning practices will prevent instances of a technician making multiple trips between the tools and parts crib and the job site. Thoughtful planning involves ensuring that when a technician goes to perform work, the tools, materials, and procedures are available. When a technician receives a work package, instead of just a work order, the technician can spend more time working on the equipment and less time researching and performing administrative tasks. The time not lost on trips back to the parts crib or finding a special tool will enable wrench time metrics to improve.

For a Maintenance department struggling with low wrench time, the implementation of a planning process will yield results. It is not uncommon for a Maintenance department with little or no planning practices to experience wrench times as low as 25%. This means that in these Maintenance departments, the technicians spend as much as 75% of their time not working on equipment. While total elimination of non-value added technician time is impossible, proper planning can enable departments to bring wrench time well above the 50% mark. Doubling the amount of time technicians spend working on maintenance tasks is well worth the effort.

Related Blogs

PID systems used in industrial automation for process control, showing how proportional, integral, and derivative controllers maintain temperature, pressure, flow, and level stability in industrial operations.
What Are PID Systems and Why Do They Matter in Industrial Operations?

What Is a PID System? A PID controller — Proportional-Integral-Derivative controller — is the most widely used feedback control mechanism […]

Maintenance workforce training program focused on reliability improvement, preventive maintenance, troubleshooting, MTTR reduction, and equipment uptime in industrial facilities.
How Maintenance Workforce Training Improves Reliability and Uptime
Learn how maintenance workforce training improves reliability, reduces downtime, lowers MTTR, increases MTBF, and strengthens industrial workforce performance.
Technical workforce assessment evaluating employee competencies, skills gaps, and workforce readiness in an industrial facility.
What Is a Technical Workforce Assessment?
Learn how technical workforce assessments help industrial organizations identify skills gaps, improve workforce readiness, reduce downtime, and align training with operational goals.